Process automation case study using the ROI-FIRST approach

Packaging Materials Procurement for Production

Industry

Veterinary Pharmaceuticals - Manufacturing

Date

Jun 10, 2026

Company size

Small (20-50 employees)

Recommendation

✅ Automate

Time saved

From 100 h to 40 h per purchasing cycle

Process automated

Procurement of packaging materials for production, from requirement to approved proof

Process description

A monthly procurement cycle for packaging materials (boxes, labels and containers) used in production. Production defines what will be manufactured; Purchasing requests quotes from 3 or 4 suppliers, who need the approved artwork from Marketing, which depends on the latest regulatory approval. Once a supplier is selected, it sends a printed proof that must be approved by Quality (dimensions, manufacturer and sanitary registration), the Scientific Director and Marketing before the order becomes final; then Purchasing follows up with the supplier on delivery times. The whole cycle runs on WhatsApp and email, takes about two weeks and involves 6 people across 3 levels for roughly 100 hours per month, with no record of who approved what or when. When an outdated artwork slips through, the supplier must remake printing plates.

ROI Automation, recommendation and costs

COP

currency $:

Level of Automation
% Automation
Cases x Month
Time x Case (hours)
Medium - stage assignment and automatic notifications, digital approvals with side-by-side artwork comparison, an approved-artwork database, scheduled supplier follow-up emails and real-time dashboards. Quotation negotiation and technical reviews remain manual
60
1
100
Personas Involucradas
Nivel de Cargo Promedio
Average Monthly Salary
Real Company Cost with Benefits
6
Mixed: General Manager/Director (Level 1, x2), Senior Analyst (Level 4, x3), Assistant/Operator (Level 6, x1)
3.070.000
4.707.231
Monthly Operational Cost
Annual Operational Cost
Estimated Monthly Savings
2.802.010
33.624.120
1.681.206
Estimated Annual Savings
Year 1 Investment
Net Benefit Year 1
20.174.472
10.170.000
10.004.472
Cumulative Net Benefit 3 Years
FTE Equivalente Liberado
31.993.416
0.6

Power in Numbers

98.4

ROI Year 1 (%)

6

Payback (months)

1.98

Cost/Benefit ratio

✅ Automate

60% of this process is automatable with a conservative estimate. The volume is low, one cycle per month, but each cycle consumes about 100 hours and two weeks across six people, and the cost of a mistake is high: an outdated artwork means remade printing plates and a delayed production run. The financial case is positive but moderate: COP $20,174,472 in annual savings against a COP $10,170,000 Year 1 investment, a 98.4% ROI with a 6-month payback. The stronger argument is accountability. Today responsibility bounces between areas and nobody can see where the cycle is stuck without asking. A previous attempt with a shared form failed because it added work and did not notify the next person; the flow has to remove steps, not add them. Once in place, the same licenses can cover product returns and export preparation, which show the same symptoms.

Signs of inefficiency detected

High manual follow-up: every purchasing cycle requires chasing suppliers and internal approvers by phone, WhatsApp and email. A task nobody owns: responsibility for delays bounces between Purchasing, Marketing and Quality, and each area points to another. Approvals without traceability: the proof is approved by three areas with no record of who approved which version or when. No status visibility: nobody knows which stage a purchase is in without asking. Unknown real time: the two-week cycle is an estimate, not a measurement. Artwork errors: approving against an outdated artwork has forced suppliers to remake printing plates. Steps outside the system: a previous shared form was abandoned because it added work and did not notify the next person. Parallel inefficiencies were identified in product returns (at least 3 per week, 7 people, 2 to 3 weeks of rework, transport costs not always recorded) and in monthly export preparation, which is handled verbally by 6 people with no record in the quality management system.

If nobody can tell you who is holding up a purchase without asking around, the delay is not in the supplier, it is in the process. Let's review your case.

+1- 407 9907657
mmp@timeautomationagency.com

NEVADA, United States

Fax : +1 775-375-4140

Shipping Address: BWH1-232-2 4104 L B MCLEOD ORLANDO, FL 32811-5650 United States

Identify the automation ROI for your FIRST process:

Or subscribe to statistics on real-world automation cases, featuring ROI and measurements of time saved:

Follow

  • Instagram
  • Linkedin

© 2025

bottom of page